The situation

The operator's management system had grown over years of change. Responsibilities were written in different ways across its documents, and some documents still named roles that had since been renamed or removed.

The team needed a view of who held each safety-critical responsibility that they could check line by line.

What Synapse did

Synapse read the 77 documents the operator supplied and extracted the responsibilities written into them. It mapped each one to a role, starting with 38 safety-critical senior leadership roles, and kept the verbatim sentence and document reference with every assignment.

Each documented activity was rated for safety criticality, and the ratings were rolled up for each role. The evidence also showed removed and renamed roles that still carried responsibilities.

What the engagement produced

77

major accident hazard documents processed

4,898

role and responsibility assignments

38

safety-critical leadership roles covered

<0.1%

quote-verification error rate

Quote matching only. Each quote Synapse recorded was checked against the source text.

Safety criticality, traced to the sentence

For the Offshore Installation Manager, 87 of the 210 responsibilities Synapse found score SC 3 or above. SC is the safety-criticality score, from 0 to 5, with 5 the highest. Filtering on it gives a reviewer a short list to check first, and each entry opens at the sentence it came from.

Synapse Offshore Installation Manager · SC 3 and above
Status Assignment Document SC
Approved Control all incident response activities on the platform As writtenThe OIM is required to control all incident response activities on the platform. 1.0 Purpose › 1.1 The Emergency Response Plan › 1.2 Emergency Response Philosophy · p.7 Kestrel Emergency Response Plan Volume 1 5
Approved Hold overall command of all emergency situations within the 500m zone As writtenOverall command of all emergency situations within the 500m zone is the responsibility of the Offshore Installation Manager (OIM). 1.0 Purpose › 1.1 The Emergency Response Plan › 1.2 Emergency Response Philosophy · p.7 Kestrel Emergency Response Plan Volume 1 5
Synapse Responsibility detail · SC 5

Control all incident response activities on the platform

As written in the document, page 7

Overall command of all emergency situations within the 500m zone is the responsibility of the Offshore Installation Manager (OIM). The OIM is required to control all incident response activities on the platform and is responsible for co-ordinating the activities of all rescue services and vessels, both air and sea, assisting with the emergency.
Role
"Kestrel Offshore Installation Manager"Manager - Offshore Installation Match synonym
Safety criticality
5

Role justification

Role from the preceding statement naming "Offshore Installation Manager (OIM)" on page 7.

What the team received

  • A role reference map showing where each leadership role appears in the management system.
  • A responsibilities register with the source text behind every entry.
  • A safety-criticality rating for each documented activity, rolled up for each role.

Download this case study (PDF, 2 pages) or read how Synapse works (PDF, 4 pages).

Let's talk

We help energy and renewables teams produce structured, traceable output for document-heavy work. Share your use case and we'll outline if and how we can help.

Contact us

Prefer to read first? Explore our products or Insights.